Aivaka
  • Home
  • Our Products
  • Contact
  • Solutions
  • FAQ

Solution To Problems

We get a good deal of questions about "How". 

"How" we might be able to get something done or "How" to do a project done.  So, we figured to create this page and post one or more ways we have been asked to get things done.  Hope it helps.



Q: We got a well and one pump running at 230V (or 115V), but 3 controllers on the property and wiring is all bad.  Now, how do we connect the 3 controllers to the pump with NO wires?  How long would this take?

A: Simple, 3 transmitters (one for each controller) and one receiver on the pump side, and it is done.  Take a look here.



Q: We have 4 controllers, ranging from 8 to 20 zones each on our property for a total of 60 valves.  We like to combine them all in one place and running wires will be a huge headache and rather NOT do it.  How can your gear get this done?

A: One WB-363T and 4 multi-zone receiver to replace the controllers and done, here is how it looks.  For larger systems we would suggest to use our 127 or 255 zone transmitters.  All of the controllers can be connected to one transmitter in single location, connect them all maybe to WiFi and eliminate the need to run around and deal with WiFi extenders.


Q: How can we run 7 valves from one zone without loading the timer?

A: Our transmitter can isolate the timer from those 7 valves and solenoids. Connect the transmitter to that ONE zone, and connect the receivers to the valves that would run from that ONE zone, and the project is done.  Take a look here.


Q: We need to operate one Master-Valve from 4 controllers that we have on our property, how do we do that?

A: One WB-124R receiver for the MV, and four transmitters (one for each controller) would take care of the project.


Site powered by Weebly. Managed by Lunarpages
  • Home
  • Our Products
  • Contact
  • Solutions
  • FAQ