Solution To Problems

We get a good deal of questions about "How". 

"How" we might be able to get something done or "How" to do a project done.  So, we figured to create this page and post one or more ways we have been asked to get things done.  Hope it helps.



Q: We got a well and one pump running at 230V (or 115V), but 3 controllers on the property and wiring is all bad.  Now, how do we connect the 3 controllers to the pump with NO wires?  How long would this take?

A: Simple, 3 transmitters (one for each controller) and one receiver on the pump side, and it is done.  Take a look here.



Q: We have 4 controllers, ranging from 8 to 20 zones each on our property for a total of 60 valves.  We like to combine them all in one place and running wires will be a huge headache and rather NOT do it.  How can your gear get this done?

A: One WB-363T and 4 multi-zone receiver to replace the controllers and done, here is how it looks.


Q: How can we run 7 valves from one zone without loading the timer?

A: Our transmitter can isolate the timer from those 7 valves and solenoids. Connect the transmitter to that ONE zone, and connect the receivers to the valves that would run from that ONE zone, and the project is done.  Take a look here.


Q: We need to operate one Master-Valve from 4 controllers that we have on our property, how do we do that?

A: One WB-124R receiver for the MV, and four transmitters (one for each controller) would take care of the project.