"How" we might be able to get something done or "How" to do a project done. So, we figured to create this page and post one or more ways we have been asked to get things done. Hope it helps.
Q: We got a well and one pump running at 230V (or 115V), but 3 controllers on the property and wiring is all bad. Now, how do we connect the 3 controllers to the pump with NO wires? How long would this take?
A: Simple, 3 transmitters (one for each controller) and one receiver on the pump side, and it is done. Take a look here.
Q: We have 4 controllers, ranging from 8 to 20 zones each on our property for a total of 60 valves. We like to combine them all in one place and running wires will be a huge headache and rather NOT do it. How can your gear get this done?
A: One WB-363T and 4 multi-zone receiver to replace the controllers and done, here is how it looks.
Q: How can we run 7 valves from one zone without loading the timer?
A: Our transmitter can isolate the timer from those 7 valves and solenoids. Connect the transmitter to that ONE zone, and connect the receivers to the valves that would run from that ONE zone, and the project is done. Take a look here.
Q: We need to operate one Master-Valve from 4 controllers that we have on our property, how do we do that?
A: One WB-124R receiver for the MV, and four transmitters (one for each controller) would take care of the project.